The drywall mud is applied in a series of layers. Now that the framing is complete, you are ready to install the drywall and mud the corners and screws. In addition, we purchased a pre-hung door, leveled it and secured it to the 2×4 framed walls. We placed 3 wall anchors along the stud as well as 4 wall anchors along the header boards.Īlso we were able to secure the footer section to the floor with screws. Using a screwdriver tighten the bolt until snug and secure. Then the molly or wall anchor along with a washer is placed into the hole. Therefore we will be securing our stud to the existing wall with mollies.įirst we drilled a hole into the 2×4 stud and into the wall. Usually a wall like this is secured into a stud.īut because we are adding a wall to an existing room, we did not have a stud at the location of our wall. Once the wall is built it is lifted, aligning the wall with the pencil markings.Īt this time, we are ready to secure the studs to the existing wall. The wall is put together flat on the floor by placing nails through the header and footer pieces into each stud. Then cut studs to fit the heights of the wall. We then cut the header and footer pieces the length of the wall. Once the space is all cleared, you can begin framing out the utility closet.įirst, we marked the wall with a pencil line showing the location of the studs.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |